Markus 427 Engine Project 2008
Final Engine 11/5/08




Large Format Images



**************************************
shipping 12/10/08


***********************************
Engine Build
Arias Piston Order Sheet
Steel Crank arrives 6/4/08
Jesel Rocker Arms arrive 6/4/08
Transmission arrives 6/23/08
6/24/08 Top Loader, Clutch Arm and Shifter
BHJ Dampner 6/27/08
Eagle H-Beam Rods 6/27/08
6/27/08 Arias
Arias Custom Pistons 6/27/08
7/18/08
7/28/08
7/28/08
8/3/08
Blue Thunder 1x4 Dual Plane Intake arrives 8/6/08
Dura Bond Side Oiler Cam bearings for the Block
8/7/08 Side Oiler 427 Block
8/12/08 Connecting Rods & Crankshaft at Assembly
Camshaft, Lifters, Springs, Retainers 8/18/08

8/23/08
8/25/08 Prime coat block for Black Final Coat
../Markus-Running-10-14-08-01184.AVI
(Note: Not with correct Valve Covers)
10/27/08
12/10/2008 09:15:32 PM |